DC Resistance Tester — Xingren Power Supply Strengthens Equipment Inspection and Maintenance Management to Ensure a Warm Winter
Read: 74 Published: 2019/6/18
With the arrival of winter, residents mostly turn on heating devices between 7 PM and 10 PM, reaching peak electricity consumption, causing a sharp increase in load, which poses a severe test for power supply equipment. To ensure the safe and reliable operation of power lines and equipment during winter, on December 14, the Transmission Management Office of Xingren Power Supply Bureau dispatched 5 employees to the 35kV Changbai Line and Dawan Line, which are at higher altitudes, to use temperature measuring devices for ice prevention work. Once any icing that could affect line safety is detected, ice prevention and removal measures will be immediately initiated to ensure the safe operation of the power grid.
It is understood that since early December, the leadership of Xingren Power Supply Bureau has attached great importance, carefully deployed, and meticulously arranged, actively taking effective measures to strictly implement safety responsibilities, conducting comprehensive defect inspection and普查 work on on-site equipment, and fully doing safety prevention work. Taking the opportunity to strengthen power supply equipment safety and investigate and rectify hidden dangers, they have strengthened equipment operation and maintenance management, combined with safety inspections and special activities for investigating and rectifying safety hazards, starting from strengthening equipment inspections, enhancing personnel responsibilities, improving emergency plans, and preparing spare parts, to do a good job in equipment cold protection and insulation in advance, preventing equipment failures caused by low temperatures, and improving equipment reliability during winter. They have further improved emergency repair plans and emergency drills to enhance the power grid's emergency response capability. They have strengthened analysis of winter supply-demand situation and power balance, reasonably arranged operation modes, and done a good job in load forecasting and monitoring.


