1. Working Principle of High Voltage Test Transformer: GYSB10KVA/100KV High Voltage Test Transformer inputs the power frequency power supply into the operation box (or operation console), and adjusts the voltage through the auto voltage regulator to input to the primary winding of the test transformer.According to the principle of electromagnetic induction, power frequency high voltage can be obtained in the secondary (high voltage) winding. This power frequency high voltage can be rectified by high-voltage silicon stack and filtered by capacitor to obtain DC high voltage, whose amplitude is 1.4 times the effective value of the power frequency high voltage. However, when using DC, the short-circuit rod should be pulled out; when using AC, insert the short-circuit rod. GYSB10KVA/100KV High Voltage Test Transformer 2. Main Technical Indicators of High Voltage Test Transformer: >Rated Capacity: 1~300KVA |